Integrity Management & Risk-Based Inspection — Engineering Services
RBI Program Development
Development of structured risk-based inspection programs aligned with API 580/581 methodology, enabling operators to prioritize inspection resources based on assessed risk to fixed equipment and piping systems.
- —Risk-based inspection program development aligned with API 580 and API 581
- —Damage mechanism identification using API 571 and facility-specific operating data
- —Probability and consequence of failure assessment for fixed equipment and piping
- —Inspection plan generation with optimised intervals and scope recommendations
- —Integration with operator maintenance management and inspection tracking systems
- —Support for regulatory and jurisdictional compliance requirements
- —Scalable from single-unit assessments to full-facility RBI programmes
- —Deliverables compatible with common RBI software platforms
RBI Program Reassessment
Periodic reassessment and update of existing RBI programs to incorporate new inspection findings, process changes, and evolving damage mechanism understanding — maintaining program validity and inspection effectiveness over time.
- —Structured reassessment of existing RBI programs against current operating data
- —Integration of recent inspection findings and turnaround results
- —Updated damage mechanism identification reflecting process or feedstock changes
- —Revised probability and consequence assessments where risk profiles have shifted
- —Inspection interval and scope adjustments based on reassessment outcomes
- —Identification of equipment where risk has increased since the prior study
- —Support for regulatory audit readiness and program credibility
- —Documented reassessment rationale for each equipment item or circuit reviewed
Damage Mechanism Review
Systematic identification and documentation of active and potential damage mechanisms across process equipment and piping systems, using API 571 and facility-specific operating data to support RBI and integrity planning.
- —Systematic identification of active and credible damage mechanisms per equipment item
- —Assessment based on API 571, materials data, and facility operating conditions
- —Evaluation of mechanisms arising from process changes or new feedstocks
- —Documented damage mechanism register for RBI and integrity planning
- —Damage morphology mapping to support inspection method selection
- —Review of historical inspection findings and failure records
- —Input to probability of failure assessment within RBI programmes
- —Applicable to pressure vessels, heat exchangers, piping, and storage tanks
Inspection Interval Optimisation
Engineering-led optimisation of inspection intervals based on assessed risk, damage rates, and inspection effectiveness — reducing unnecessary inspection costs while maintaining equipment integrity and regulatory compliance.
- —Risk-informed inspection interval determination based on assessed damage rates
- —Remaining life calculations supporting interval extension or reduction decisions
- —Inspection effectiveness evaluation for current and proposed methods
- —Documented engineering rationale for each interval recommendation
- —Alignment with jurisdictional and regulatory inspection requirements
- —Turnaround scope optimisation through targeted inspection planning
- —Reduction of unnecessary inspection costs on low-risk equipment
- —Prioritisation of inspection resources toward higher-risk items
Consequence of Failure Assessment
Assessment of potential consequences arising from equipment failure, covering safety, environmental, production, and financial impact scenarios to support risk ranking within RBI and integrity management programs.
- —Safety, environmental, production, and financial consequence evaluation
- —Release scenario modelling for flammable and toxic fluid services
- —Consequence analysis aligned with API 581 methodology
- —Risk matrix integration for RBI program development
- —Differentiation of high-consequence and low-consequence equipment
- —Support for turnaround scope and integrity investment decisions
- —Input to management of change and process safety reviews
- —Documented consequence rationale for regulatory and audit purposes
Integrity Operating Windows
Establishment of integrity operating windows that define the process parameter boundaries within which equipment damage mechanisms remain within expected limits, supporting proactive integrity management between inspections.
- —Definition of integrity operating windows linked to specific damage mechanisms
- —Standard, alert, and critical limit establishment for key process parameters
- —Monitoring and response protocols for process excursion management
- —Integration with RBI programme assumptions and inspection planning
- —Support for proactive integrity management between inspection intervals
- —Coordination with operations, process engineering, and integrity teams
- —Alignment with facility integrity management and process safety frameworks
- —Practical field implementation compatible with existing control systems
CUI Integrity Management
Corrosion under insulation management programs covering risk assessment, inspection strategy, and prioritization for insulated equipment and piping — supporting systematic CUI threat management across operating facilities.
- —CUI risk screening and susceptibility-based prioritisation
- —Inspection strategy development for insulated equipment and piping
- —Inspection method selection appropriate to equipment type and access constraints
- —Integration with RBI programs and broader integrity management frameworks
- —Application of API 583 and AMPP/NACE corrosion management practices
- —Assessment of operating temperature profiles, insulation condition, and coating history
- —Support for insulation maintenance and replacement planning decisions
- —Documented CUI management program for regulatory and audit readiness
PSV Assessment & RBI Integration
Assessment of pressure safety valve integrity and reliability within the RBI program framework, supporting risk-informed PSV testing strategies and compliance with applicable codes and jurisdictional requirements.
- —PSV integrity and reliability assessment within the RBI framework
- —Review of service conditions, failure history, and historical test records
- —Failure probability and consequence evaluation for PSV failure scenarios
- —Risk-informed PSV testing strategies aligned with API 581 and API 576
- —Integration of PSV risk assessment with fixed equipment RBI programmes
- —Support for turnaround PSV testing scope and prioritisation
- —Documented rationale for PSV test interval and scope decisions
- —Practical implementation within existing maintenance planning systems
Explore Other TES Canada Service Pillars
Ready to Discuss Your Integrity Challenge?
TES Canada provides practical, engineering-led solutions for asset integrity, inspection, welding, and pipeline challenges. Contact us to discuss how we can support your specific requirements.

