TES CanadaIntegrity Engineering
Discuss Your Challenges
Integrity & Inspection

Facility Integrity Management Plan Development

Development of facility-level integrity management plans that establish the framework for managing equipment integrity across operating plants, terminals, compressor stations, and processing facilities.

A facility integrity management plan provides the overarching framework that governs how equipment integrity is managed across an operating site. TES Canada develops facility-level integrity management plans that define the policies, processes, roles, and technical programmes needed to maintain equipment and structural integrity throughout the facility's operating life.

Plan development covers the full scope of facility integrity — including pressure equipment, piping, storage tanks, structural elements, and safety-critical devices — and addresses inspection planning, damage mechanism management, fitness-for-service assessment, repair management, integrity operating windows, and management of change. TES Canada ensures that the plan is aligned with applicable regulatory requirements and industry standards, and is practical for implementation by the operator's engineering and maintenance teams.

The deliverable is a documented management plan that serves as the facility's integrity management reference — establishing clear accountabilities, technical programme requirements, and performance monitoring arrangements. TES Canada develops plans that are proportionate to facility risk and complexity, avoiding unnecessary administrative burden while ensuring that all significant integrity threats are systematically addressed.

Discuss This ServicePipeline & Facility Integrity
Key Capabilities

What This Service Covers

1Facility-level integrity management plan development for operating sites
2Coverage of pressure equipment, piping, storage tanks, and structural elements
3Definition of inspection, assessment, and repair management processes
4Integration of RBI, damage mechanism management, and fitness-for-service programmes
5Alignment with applicable regulatory requirements and industry standards
6Clear accountability and role definition for integrity management activities
7Performance monitoring and plan review arrangements
8Practical and proportionate to facility risk and operational complexity
Related Services

Connected TES Canada Services

Integrity Management Plan DevelopmentRBI Program DevelopmentPressure Vessel Integrity AssessmentTurnaround Integrity Planning
Get in Touch

Discuss Your Facility Integrity Management Plan Development Requirements

TES Canada provides practical, engineering-led services for oil & gas, LNG, pipeline, and industrial clients across Canada. Contact us to discuss your specific requirements.

Contact TES CanadaAll Services